Achieving complete nitrification below the washout SRT with hybrid membrane aerated biofilm reactor (MABR) treating municipal wastewater
2021
This study analyzed the performances of a hybrid membrane aerated biofilm reactor (MABR) pilot plant in terms of nutrients removal of the attached growth and suspended biomass in comparison with a conventional activated sludge (CAS) system at different sludge retention time (SRT) (20−3) days. Overall, the MABR showed better performances than the CAS in terms of TSS (86% vs 79%), COD (89% vs 85%) and total nitrogen (80% vs 65%). The minimum SRT for achieving complete nitrification in the MABR was close to 3 days, corresponding to a SRT in the aerobic compartment of 1.9 days, whereas in the CAS it was equal to 8 days (aerobic SRT of 4.8 days). Nitrification rate in biofilm was on average equa…